Article ID Journal Published Year Pages File Type
1705335 Applied Mathematical Modelling 2012 17 Pages PDF
Abstract

This work develops a novel two-stage fuzzy optimization method for solving the multi-product multi-period (MPMP) production planning problem, in which the market demands and some of the inventory costs are assumed to be uncertainty and characterized by fuzzy variables with known possibility distributions. Some basic properties about the MPMP production planning problem are discussed. Since the fuzzy market demands and inventory costs usually have infinite supports, the proposed two-stage fuzzy MPMP production planning problem is an infinite-dimensional optimization problem that cannot be solved directly by conventional numerical solution methods. To overcome this difficulty, this paper adopts an approximation method (AM) to turn the original two-stage fuzzy MPMP production planning problem into a finite-dimensional optimization problem. The convergence about the AM is discussed to ensure the solution quality. After that, we design a heuristic algorithm, which combines the AM and simulated annealing (SA) algorithm, to solve the proposed two-stage fuzzy MPMP production planning problem. Finally, one real case study about a furniture manufacturing company is presented to illustrate the effectiveness and feasibility of the proposed modeling idea and designed algorithm.

Related Topics
Physical Sciences and Engineering Engineering Computational Mechanics
Authors
,