Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1705763 | Applied Mathematical Modelling | 2009 | 7 Pages |
Abstract
Previous studies have proposed an integrated production and inspection model for a deteriorating production system whose process is characterized by an exponential distribution. Since the simultaneous determination of the optimal scheduled inspection times and the optimal production run length is difficult, an approximative production and inspection solution is obtained under the condition that the optimal inspection policy is equally-spaced. That is, obtaining an approximative production run length and number of inspections. This study further investigates this approximative solution and demonstrates that how to utilize it to obtain the real optimal solution more efficiently.
Keywords
Related Topics
Physical Sciences and Engineering
Engineering
Computational Mechanics
Authors
Chih-Hsiung Wang, Ruey Huei Yeh,