| Article ID | Journal | Published Year | Pages | File Type | 
|---|---|---|---|---|
| 1707166 | Applied Mathematical Modelling | 2007 | 12 Pages | 
Abstract
												In this paper, we analyze the manufacturing lead time in a production system with BMAP (Batch Markovian Arrival process) input and post-operation operated under the N-policy. We use the factorization principle to derive the waiting time distribution (hence the manufacturing lead time) and the mean performance measures. A numerical example is provided.
Keywords
												
											Related Topics
												
													Physical Sciences and Engineering
													Engineering
													Computational Mechanics
												
											Authors
												Ho Woo Lee, No Ik Park, Se Won Lee, 
											