Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1707166 | Applied Mathematical Modelling | 2007 | 12 Pages |
Abstract
In this paper, we analyze the manufacturing lead time in a production system with BMAP (Batch Markovian Arrival process) input and post-operation operated under the N-policy. We use the factorization principle to derive the waiting time distribution (hence the manufacturing lead time) and the mean performance measures. A numerical example is provided.
Keywords
Related Topics
Physical Sciences and Engineering
Engineering
Computational Mechanics
Authors
Ho Woo Lee, No Ik Park, Se Won Lee,