Article ID Journal Published Year Pages File Type
1714474 Acta Astronautica 2015 22 Pages PDF
Abstract
By September 2014 our previously poor knowledge of the characteristics of the nucleus of the comet has increased drastically and the nominal and backup landing could be selected. The nominal site, as well as the corresponding descent strategy have been confirmed in mid-October, one month before the landing. The paper summarizes the selection process for a landing site and the planning for Separation-Descent-Landing (SDL).
Related Topics
Physical Sciences and Engineering Engineering Aerospace Engineering
Authors
, , , , , , , , , , , , , ,