| Article ID | Journal | Published Year | Pages | File Type | 
|---|---|---|---|---|
| 1714474 | Acta Astronautica | 2015 | 22 Pages | 
Abstract
												By September 2014 our previously poor knowledge of the characteristics of the nucleus of the comet has increased drastically and the nominal and backup landing could be selected. The nominal site, as well as the corresponding descent strategy have been confirmed in mid-October, one month before the landing. The paper summarizes the selection process for a landing site and the planning for Separation-Descent-Landing (SDL).
											Related Topics
												
													Physical Sciences and Engineering
													Engineering
													Aerospace Engineering
												
											Authors
												Stephan Ulamec, Jens Biele, Alejandro Blazquez, Barbara Cozzoni, Cedric Delmas, Cinzia Fantinati, Philippe Gaudon, Koen Geurts, Eric Jurado, Oliver Küchemann, Valentina Lommatsch, Michael Maibaum, Holger Sierks, Lars Witte, 
											