Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1729040 | Annals of Nuclear Energy | 2012 | 7 Pages |
Abstract
⺠Probabilistic fracture analyses for BWR/RPV under the LTOP event have been performed. ⺠Low probability of failure for circumferential weld at beltline region can be found. ⺠In-service inspection on the circumferential welds can be relieved permanently. ⺠Periodic inspection for axial shell welds is still recommended.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
Chin-Cheng Huang, Hsoung-Wei Chou, Bo-Yi Chen, Ru-Feng Liu, Hsien-Chou Lin,