Article ID Journal Published Year Pages File Type
1731085 Energy 2015 15 Pages PDF
Abstract
A TSA was previously carried out on the Stenungsund petrochemical cluster in Sweden, leading to the design of a utility system to significantly reduce the overall energy consumption of the cluster. The solution proposes that a common utility system would decrease the hot utility demand from 124 MWth to 70 MWth. The multi-period analysis methodology is demonstrated by application to this case study in order to identify the resilience of the proposed solution when faced with variations in heat production and consumption. The multi-period analysis of the proposed utility system leads to the identification of a peak utility demand of 88 MWth rather than the previously identified 70 MWth. A Total Site Sensitivity Analysis leads to a better understanding of the contribution of each of the clusters units and feasibility of investments.
Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, , , , ,