Article ID Journal Published Year Pages File Type
1732396 Energy 2014 14 Pages PDF
Abstract

•Small-scale bCHP (biomass combined heat and power) project development barrier review.•Techno-economic analysis of a recently failed small-scale bCHP project.•Suggestions for improving the resilience of small-scale bCHP project.

bCHP (Biomass combined heat and power) systems are highly efficient at smaller-scales when a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost fossil fuel incumbent. The paper reviews the barriers to small-scale bCHP project development in the UK along with a case study of a failed 1.5 MWel bCHP scheme. The paper offers possible explanations for the project's failure and suggests adaptations to improve the project resilience. Analysis of the project's: capital structuring; contract length and bankability; feedstock type and price uncertainty, and; plant oversizing highlight the negative impact of the existing project barriers on project development. The research paper concludes with a discussion on the effects of these barriers on the case study project and this industry more generally. A greater understanding of the techno-economic effects of some barriers for small-scale bCHP schemes is demonstrated within this paper, along with some methods for improving the attractiveness and resilience of projects of this kind.

Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, , ,