Article ID Journal Published Year Pages File Type
1733908 Energy 2012 10 Pages PDF
Abstract

After tremendous growth of wind power generation capacity in recent years, China now has 44.7 GW of wind-derived power. Despite the recent growth rates and promises of a bright future, two important issues - the capability of the grid infrastructure and the availability of backup systems - must be critically discussed and tackled in the medium term.The study shows that only a relatively small share of investment goes towards improving and extending the electricity infrastructure which is a precondition for transmitting clean wind energy to the end users. In addition, the backup systems are either geographically too remote from the potential wind power sites or currently financially infeasible. Finally, the introduction of wind power to the coal-dominated energy production system is not problem-free. Frequent ramp ups and downs of coal-fired plants lead to lower energy efficiency and higher emissions, which are likely to negate some of the emission savings from wind power.The current power system is heavily reliant on independently acting but state-owned energy companies optimizing their part of the system, and this is partly incompatible with building a robust system supporting renewable energy technologies. Hence, strategic, top-down co-ordination and incentives to improve the overall electricity infrastructure is recommended.

► We analyse the power grid availability for large-scale wind integration in China. ► We examine the choices of backup systems for the compensation of wind power. ► The Chinese power grid infrastructure is not sufficient to integrate the wind power. ► The backup systems are either geographically unavailable or financially infeasible. ► Using coal-fired plants as the backup system is unavoidable but not problem-free.

Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, , ,