Article ID Journal Published Year Pages File Type
1736377 Energy 2006 10 Pages PDF
Abstract

In Denmark, a technological change towards cleaner energy technologies has been developed and implemented since around 1975. This development has had two phases: The first from 1975 until around 1996, when wind power was a niche production that supplied only 3.5% of the electricity consumption and was brought close to cost competitiveness, and the present second phase, in which wind power supplies an increasing share (in 2004 18.6%) of electricity consumption along with combined heat and power plants, which supply around 50% of consumption. Denmark succeeded in overcoming the first phase, and a large green energy technology cluster was established. During the second phase, new difficulties and challenges have arisen, both with regard to local public acceptance and the need for integrating an increasing percentage of fluctuating energy sources into the energy system. In this Phase 2, a new offensive green energy policy should be introduced in order to secure both public and political acceptance. Local markets should be established in order to secure the technical integration of a large proportion of wind power and other fluctuating renewable energy sources into the energy system.

Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
,