Article ID Journal Published Year Pages File Type
1740135 Nuclear Engineering and Technology 2013 6 Pages PDF
Abstract

The beam position monitor (BPM) is an essential component for the PEFP 100-MeV linac's commissioning. A prototype stripline-type linac BPM was designed for this purpose. The electrode aperture is 20 mm in diameter, and the electrode is 25 mm long, so it can be installed between Drift Tube Linac (DTL)101 and DTL102, which is the shortest distance. One end of the electrode is connected to the Sub Miniature Type A (SMA) feed through for signal measurement, and the other end is terminated as a short. The signal amplitude of the fundamental component was calculated and compared with that of the second harmonic component. The designed BPM was fabricated and a low-power RF test was conducted. In this paper, the design, fabrication and low power test of the BPM for the PEFP linac are presented.

Related Topics
Physical Sciences and Engineering Energy Nuclear Energy and Engineering
Authors
, , , , , ,