Article ID Journal Published Year Pages File Type
1741130 Progress in Nuclear Energy 2009 4 Pages PDF
Abstract

To access possible economic advantages of reprocessing and recycling the spent fuel from nuclear power reactors against a once through policy, a proposed scenario for twin BWRs was established. Calculations for the amount of fuel that the plants will use and generate during 40 years of operation under each scenario were made. An evaluation of costs for each option applying current prices for uranium and services were then carried out. Finally a comparison between the options was made, and it was found that the recycling option is more expensive than the once through cycle by about 4%.

Keywords
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , ,