Article ID Journal Published Year Pages File Type
1742526 Geothermics 2010 8 Pages PDF
Abstract

The performance of Calpine's Geysers steam field from startup in 1960 to 2008 is described in this paper. Since October 2003, Calpine has received approximately 482 L/s of tertiary-treated reclaimed water from the City of Santa Rosa. To accommodate and derive benefit from this water, Calpine has converted 20 wells (ten producers, six shut-in, two observation, and two suspended wells) to high-rate injection service. Additional nine wells were also converted to low-rate injectors that receive 12.6 L/s or less. Annual recovery factors (i.e., fieldwide increase in annual steam production divided by annual injection) for the first 5 years of Santa Rosa Geysers Recharge Project (SRGRP) operation have been estimated at 17.6%, 26.1%, 37.1%, 39% and 44.6%, respectively; reasonably close to or slightly higher than the values, predicted prior to SRGRP startup. Using a revised definition that includes the amount of un-boiled water in the reservoir, the annual recovery factors turn out to be 17.6%, 16.1%, 14.6%, 12.4% and 12.2% from year one through year five. Improvements in the wellfield, water injection, and power plant modifications from January 1995 through December 2008 are also discussed in this paper.

Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Geochemistry and Petrology
Authors
, ,