Article ID Journal Published Year Pages File Type
1822786 Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment 2014 11 Pages PDF
Abstract
Fermilab׳s Accelerator Complex has been recently upgraded, in order to increase the 120 GeV proton beam power on target from about 400 kW to over 700 kW for NOνA and other future intensity frontier experiments. One of the key ingredients of the upgrade is the offloading of some Main Injector synchrotron operations - beam injection and RF manipulation called “slip stacking” - to the 8 GeV Recycler Ring, which had until recently been used only for low-intensity antiproton storage and cooling. This required construction of two new 53 MHz RF systems for the slip-stacking manipulations. The cavities operate simultaneously at Vpeak≲150kV, but at slightly different frequencies (Δf=1260Hz). Their installation was completed in September 2013. This paper describes the novel solutions used in the design of the new cavities, their tuning system, and the associated high power RF system. First results showing effective operation of the RF system, beam capture and successful slip-stacking in the Recycler Ring are presented.
Keywords
Related Topics
Physical Sciences and Engineering Physics and Astronomy Instrumentation
Authors
,