Article ID Journal Published Year Pages File Type
1826373 Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment 2011 4 Pages PDF
Abstract
The data acquisition for the NEMO km3 detector is based on the all data to shore approach. The continuous data stream, coming from more than 8000 PMTs, will be greater than 32 GBps, and therefore it requires a fast on-line filtering for an appropriate noise suppression. An on-shore multi-system Trigger Infrastructure has been studied to handle and real-time analyze such an amount of data. In order to accomplish the data acquisition of the NEMO prototype tower, expandable algorithms and services for data handling, system control and monitoring have been prepared.
Related Topics
Physical Sciences and Engineering Physics and Astronomy Instrumentation
Authors
, ,