Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1829113 | Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment | 2008 | 8 Pages |
Abstract
The beam acceleration to a design energy of 181 MeV for the first phase (Phase I) was successfully performed in February 2007 and the centroid momentum fluctuation of the beam pulse was within ±0.015%, while the required stability was within ±0.025%. Now the beam commissioning has been steadily continued.
Related Topics
Physical Sciences and Engineering
Physics and Astronomy
Instrumentation
Authors
T. Kobayashi, E. Chishiro, S. Anami, S. Yamaguchi, S. Michizono,