Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1831670 | Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment | 2007 | 5 Pages |
Abstract
Beam phase measurements performed during the commissioning of the ACCEL 250 MeV medical proton cyclotrons are presented and compared to results of orbit tracking computations based on high accuracy magnetic field map measurements. The agreement between measured and intended beam phase behavior was found to be excellent.
Related Topics
Physical Sciences and Engineering
Physics and Astronomy
Instrumentation
Authors
C. Baumgarten, A. Geisler, U. Klein, D. Krischel, H. Röcken, M. Schillo, T. Stephani, J.H. Timmer,