Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1869623 | Physics Procedia | 2012 | 6 Pages |
Abstract
In order to research on the effect on the hydropower benefits of SiPing Hydropower station by SaLiPing hydropower station in operation, cascaded optimal operation model has been established, with the objective function of maximizing minimum power and maximizing the generated energy capacity respectively, 0.5 times power probability is selected as system power constraint. The hydropower benefits in SiPing hydropower station is calculated before and after SanLiPing in operation. The result shows that after SanLiPing in operation, the hydropower benefits in SiPing are improved through the compensation of SanLiPing, as well as its flood control condition, brought huge economic benefits to cascaded hydropower stations.
Related Topics
Physical Sciences and Engineering
Physics and Astronomy
Physics and Astronomy (General)