Article ID Journal Published Year Pages File Type
1873287 Physics Procedia 2014 5 Pages PDF
Abstract

Next-generation experiments with ultracold neutrons are driven by the strength of the neutron sources as well as by the environmental conditions where the experiments are performed. Properly designed beam position infrastructure is therefore crucial to make use of new facilities, e.g. for the measurement of the electric dipole moment of the neutron. As an example for a next-generation effort, the beam position requirements at the FRM-II are discussed and the progress of the implementation of the non-magnetic facility is presented.

Related Topics
Physical Sciences and Engineering Physics and Astronomy Physics and Astronomy (General)