According to government regulations, the emergency planning zone (EPZ) of a nuclear power plant (NPP) must be designated before operation and reevaluated every 5 years. Corresponding emergency response planning (ERP) has to be made in advance to guarantee that all necessary resources are available under accidental releases of radioisotope. In this study, the EPZ for each of the three operating NPPs, Chinshan, Kuosheng, and Maanshan, in Taiwan was reevaluated using the MELCOR Accident Consequence Code System 2 (MACCS2) developed by Sandia National Laboratory. Meteorological data around the nuclear power plant were collected during 2003. The source term data including inventory, sensible heat content, and timing duration, were based on previous PRA information of each plant. The effective dose equivalent and thyroid dose together with the related individual risk and societal risk were calculated. By comparing the results to the protective action guide and related safety criteria, 1.5, 1.5, and 4.5 km were estimated for Chinshan, Kuosheng, and Maanshan NPPs, respectively. We suggest that a radius of 5.0 km is a reasonably conservative value of EPZ for each of the three operating NPPs in Taiwan.
Related Topics
Physical Sciences and Engineering Physics and Astronomy Radiation
Authors
, , , , ,