Article ID Journal Published Year Pages File Type
234214 Minerals Engineering 2009 5 Pages PDF
Abstract

The objective of this study is to investigate the effect of ball size on grinding kinetics in a pilot scale ball mill. Six different ball media gradings were tested. Comparative tests were conducted in batch ball mill having 1.2 m diameter and 0.6 m length at constant operating condition of mill such as media mass, mill speed and input specific energy. Feed samples were ground batchwise and representative sample was taken from inside the mill for each determined grinding period. Grinding process in ball mill was modeled and the specific rate of breakage was calculated for the each test. The results indicated that the relationship between different breakage rate and particle size has a maximum for each ball size distribution. Consequently, a new equation to correlate maximum ball size and particle size at maximum breakage occurs is proposed.

Related Topics
Physical Sciences and Engineering Chemical Engineering Chemical Engineering (General)
Authors
, ,