Article ID Journal Published Year Pages File Type
234598 Minerals Engineering 2008 5 Pages PDF
Abstract

The concentrator at Minera Los Pelambres currently processes 130,000 tpd of Cu/Mo ore. The rougher circuit originally consisted of four flotation banks. In August 2006 the rougher circuit was enlarged adding two flotation banks, each one consisting of 5 cells of 250 m3.This paper describes the metallurgical comparison between the new flotation banks and the old ones (130 m3 cells) operating in parallel. For this purpose, 5 overall mass balances were developed for a range of feed flowrate (4000–7000 tph). Thus, an effective comparison between the cell hydrodynamics, as well as the effect that the number of cells per bank has on the overall bank recovery, was developed. Also, the effects of internal launders on cells stabilization and mineral recovery were analysed. Results on mineral upgrade and recovery, per size classes, showed that the banks of 5 cells (250 m3) gave metallurgical results similar to the banks of 9 cells (130 m3).

Related Topics
Physical Sciences and Engineering Chemical Engineering Chemical Engineering (General)
Authors
, , ,