Article ID Journal Published Year Pages File Type
261041 Construction and Building Materials 2008 11 Pages PDF
Abstract

This paper details the implementation of an innovative timber bridge technology developed for secondary road applications. A pilot bridge was constructed and field tested under loads comparable to required design loads. A through-girder primary system with transverse floor beams and longitudinal wood deck secondary system are involved. A unique steel hanger system for suspending the transverse floor beams and providing I-beam action under lateral load was configured. Results of the field load test program and analytical predictions from a computer model are described. The pilot bridge proved to be economically competitive and structurally effective.

Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
, , ,