Article ID Journal Published Year Pages File Type
271201 Fusion Engineering and Design 2014 5 Pages PDF
Abstract

•RAFM rectangular tubes were fabricated by cold drawing, and the dimensional accuracy and mechanical properties of rectangular tubes were tested.•Rectangular tubes were bent by rotary bending, and milled plates were curved by molding. Its accuracy meets the requirement for TBM assembly.•FW were pre-sealed by electron beam welding, and assembled by hot isostatic pressing–diffusion bonding.•The as-HIPed FW mock-up was tested by optical observation and X-ray detection, it revealed obviously that the tubes and plates were bonded well.

The dual functional lithium lead blanket is chosen as one of the candidate blankets for China fusion reactor, for its advantages of tritium breeding and good heat exchange performance. As one of the most important components of the blanket, the first wall (FW) is assembled with China low activation martensitic (CLAM) rectangular tubes and plates by hot isostatic pressing (HIP)–diffusion bonding (DB). In this work, the rectangular tube fabrication and FW assembly were carried out in order to verify the feasibility of the FW fabrication scheme. The mechanical property and dimensional accuracy of CLAM rectangular tubes were tested, the microstructure observation and non-destructive detection revealed the sound of the FW mock-up, and the reliability of the FW mock-ups is under evaluation.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , , , ,