Article ID Journal Published Year Pages File Type
271696 Fusion Engineering and Design 2013 6 Pages PDF
Abstract

The JET programme is strongly focused on preparations for ITER construction and exploitation. To this end, a major programme of machine enhancements has recently been completed, including a new ITER-like wall, in which the plasma-facing armour in the main vacuum chamber is beryllium while that in the divertor is tungsten—the same combination of plasma-facing materials foreseen for ITER. The goal of the initial experimental campaigns is to fully characterise operation with the new wall, concentrating in particular on plasma-material interactions, and to make direct comparisons of plasma performance with the previous, carbon wall. This is being done in a progressive manner, with the input power and plasma performance being increased in combination with the commissioning of a comprehensive new real-time protection system. Progress achieved during the first set of experimental campaigns with the new wall, which took place from September 2011 to July 2012, is reported.

► JET has recently completed the installation of an ITER-like wall. ► Important operational aspects have changed with the new wall. ► Initial experiments have confirmed the expected low fuel retention. ► Disruption dynamics have change dramatically. ► Development of wall-compatible, ITER-relevant regimes of operation has begun.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
,