Abstract

In the context of the ITER contract “ITER/CT/07/219–200 kV Stored Energy Tests”, electrical breakdown tests have been performed in vacuum with a stored energy of up to 425 J. The experiments have been conceived and performed with the collaboration of Consorzio RFX. The tests are being performed in the 1 MV test facility at IRFM, CEA-Cadarache. They should simulate the conditions that will be found in the ITER Neutral Beam accelerator, at 200 kV. This paper presents the set-up of the test bed, the choice of critical components, the diagnostic equipments and the results obtained with 200 kV applied on the anode electrode.