ECH (Electron Cyclotron Heating) for ITER will deliver into the plasma 20 MW of RF power. The procurement of the RF sources will be shared equally between the three following partners: Europe, Japan and Russia. Moreover, Europe decided to develop a RF source capable of 2 MW CW of RF power, based on the design of a coaxial gyrotron with a depressed collector. In order to be able to develop and test these RF sources, a Test Facility (TF) has been built at the CRPP premises in Lausanne (CH).The present paper will first remind the main operation conditions considered to test safely a gyrotron. The power supplies parameters allowing to fulfill these conditions will be reviewed. The core of the paper content will describe the newly installed Main High Voltage Power Supply (MHVPS), to be connected to the gyrotron cathode and capable of −60 kV/80 A-CW. The principle, the characteristics, the on-site test results will be described at the light of the requirements imposed by the gyrotron testing. Particular aspects of the installation and commissioning on-site will be highlighted in comparison with the ITER environment. The synchronized operation of the MHVPS and the BPS (Body Power Supply) on dummy load, piloted through the TF remote control, will be presented and commented.Since the TF supply structure has been built integrating the particular conditions and requirements expected for ITER, a conclusion will summarize the performances obtained at the light of these criteria.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , , , , , ,