Article ID Journal Published Year Pages File Type
273337 Fusion Engineering and Design 2009 11 Pages PDF
Abstract

DEMO is the main step foreseen after ITER to demonstrate the technological and commercial viability of a fusion power plant. DEMO R&D requirements are usually identified on the basis of the functions expected from each individual system. An approach based on the analysis of overall plant functional requirements sheds new light on R&D needs. The analysis presented here focuses on two overall functional requirements, efficiency and availability. The results of this analysis are presented here putting emphasis on systems not sufficiently considered up to now, e.g. the heating and current drive systems, while more commonly addressed systems such as tritium breeding blankets are not discussed in detail. It is also concluded that an overall functional analysis should be adopted very early in the DEMO conceptual design studies in order to provide a fully integrated approach, which is an absolute requirement to ensure that the ambitious goals of this device will be ultimately met.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , , , ,