Article ID Journal Published Year Pages File Type
273640 Fusion Engineering and Design 2007 6 Pages PDF
Abstract

The primary loop for the Helium Cooled Pebble Bed Test Blanket Module (HCPB-TBM) has been investigated with regard to layout definition, selection and dimensioning of components including piping and mechanical integration of the circuit into the different sections of ITER. The accommodation of the main components of the helium loop into the Torus Coolant Water System (TCWS) vault turned out as the most challenging point. Additionally operational states have been defined and the dynamic circuit behaviour has been investigated during transitions between operational states and accident situations with the RELAP5- code.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , , ,