Article ID Journal Published Year Pages File Type
274771 Hormign y Acero 2015 12 Pages PDF
Abstract
This footbridge is formed by a 70.7 m long balcony beam, fixed to both projecting walls at either end. The flying beam is constructed of a steel-concrete composite semi-circular section 1.45 m thick. The abutments, the massive concrete pieces, are used as counterweights to anchor the structure to the terrain and gracefully achieve the geometrical and structural transition between the terrain and twin projecting walls.
Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
, , ,