Article ID Journal Published Year Pages File Type
275710 International Journal of Project Management 2015 15 Pages PDF
Abstract

•We develop a complexity measurement model for megaprojects in China.•The model using FANP reflects the interactions among numerous elements.•The model using FANP deals with uncertainty and vagueness of language.•The model can determine the level of complexity of mega construction projects.•We provide suggestions for the application of this measurement model.

Mega construction projects in China are usually very complicated in nature, thus evaluating and understanding these complexities are critical to the success of these megaprojects. However, empirical studies related to the measurement of the complexity of megaprojects remain lacking. This paper aims to fill this gap by developing a complexity measurement model based on the Shanghai Expo construction project in China using fuzzy analytic network process (FANP). Firstly, a complexity measurement model consisting of 28 factors, which are grouped under six categories, namely, technological, organizational, goal, environmental, cultural and information complexities, is formulated through literature review using the content analysis technique. The model is then refined by a two-round Delphi survey conducted in the case megaproject. Finally, the refined model and suggestions for its application are provided based on the survey results. The model is believed to be beneficial for scholars and serve as reference for professionals in managing megaprojects.

Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
, , , ,