Article ID Journal Published Year Pages File Type
275985 International Journal of Project Management 2013 15 Pages PDF
Abstract

Iso-score curves graph (iSCG) and mathematical relationships between Scoring Parameters (SP) and Forecasting Parameters (FP) can be used in Economic Scoring Formulas (ESF) used in tendering to distribute the score among bidders in the economic part of a proposal.Each contracting authority must set an ESF when publishing tender specifications and the strategy of each bidder will differ depending on the ESF selected and the weight of the overall proposal scoring.The various mathematical relationships and density distributions that describe the main SPs and FPs, and the representation of tendering data by means of iSCGs, enable the generation of two new types of graphs that can be very useful for bidders who want to be more competitive: the scoring and position probability graphs.

► Iso-score curve graphs increase bidders' chances of winning contracts ► Scoring probability graphs allow bidders to surpass economic scores in tendering ► Position probability graphs allow bidders to surpass competitors' bids in tendering ► Combining iSCGs, SPGs and PPGs a new bid tender forecasting is complete.

Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
, , ,