Article ID Journal Published Year Pages File Type
276382 International Journal of Project Management 2009 10 Pages PDF
Abstract

The most important element in construction procurement is the contractor selection, which can result from contractor’s ranking. Contractor prequalification is essential in most construction projects, and the process has been performed by many different methods in practice. In most studies of contractor selection, selection criteria are assumed to be independent of each other. However, these criteria are likely to affect each other. The main purpose of this paper is to show how the graph theory and matrix methods may be served as a decision analysis tool for contractor selection–which is more suitable to be employed in this interdependent relationship framework. This method can be used as a decision support system by project owners in order to identify an eligible contractor to be awarded the contract.

Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
, , ,