Article ID Journal Published Year Pages File Type
276685 International Journal of Project Management 2014 11 Pages PDF
Abstract

•Our case study shows how a creative team keeps a large-scale project on track.•We show how three practices allow for creativity within a certain trajectory.•The discipline inherent in professional practice is part of the projects' controls.

Keeping large scale projects “on time and on budget” is no trivial accomplishment, especially when they rely on creative contributions from multiple individuals and groups that cannot be precisely timed. Simultaneously delivering on all of these aspects requires a flexible and nuanced approach to controls that builds on the discipline instilled in professional practice. We substantiate this insight with 82-day ethnography of a dramatic television series production as it unfolded in real-time. Our analyses reveal three distinct practices enacted by project members to (re)balance creativity within the parameters of the project: 1) analogically linking controls with creative tasks; 2) (in)formally attuning creative tasks to controls as the project unfolds; and 3) (re)allocating scarce resources to realize creative aspirations of the project. Taken together, these practices organically but predictably (re)balance creativity and control in large scale projects.

Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
, ,