Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
297887 | Nuclear Engineering and Design | 2011 | 10 Pages |
Abstract
⺠Studied the approach to equilibrium fuelling scheme of 500 MWe PFBR. ⺠A more detailed 3-D core burnup modeling done using FARCOB code. ⺠Achieved equilibrium after 2 cycles of 180 full power days each. ⺠A novel interpolation scheme is used to find the peak LHR in a fuel assembly. ⺠All core parameters in each cycle satisfied the design requirements.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
K. Devan, A. Riyas, P. Mohanakrishnan,