Article ID Journal Published Year Pages File Type
298735 Nuclear Engineering and Design 2008 10 Pages PDF
Abstract

Korea Atomic Energy Research Institute (KAERI) has developed two methods to handle the problems when a one top PSA model used in a risk monitor was developed that could not match the structure of house trees. These two methods are (1) the development of a special gate called a ‘condition gate’ and (2) the implementation of an If-Then-Else (ITE) logic in the PSA model structure. The proposed methods were applied to an example case, e.g., the station blackout (SBO) accident sequences of a one top PSA model. It was demonstrated that these methods could properly handle the complex condition changes of a system during the SBO accident sequences by using the proposed methods.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , ,