Article ID Journal Published Year Pages File Type
299280 Nuclear Engineering and Design 2007 10 Pages PDF
Abstract

Stress corrosion cracks have been discovered in Group Distribution Headers (GDH) at the Ignalina and Chernobyl Nuclear Power Plants. This increases the probability that a guillotine pipe break can occur that creates a whipping pipe (GDH) with the potential to damage surrounding structures—i.e. adjacent GDH and its attached piping or adjacent reinforced concrete compartment wall. The GDH is the most important component for reactor safety in case of an accident. Emergency Core Cooling System (ECCS) piping is connected to the GDH piping such that, during an accident, coolant passes from the ECSS into the GDH.Presented in this paper is the transient analysis of a Group Distribution Header following a guillotine break at the blind end of the header. Using a very conservative force loading function, the transient response of a whipping RBMK-1500 GDH along with neighboring concrete walls and pipelines is obtained using finite element methodology.The results of the study, assuming that the impacted GDH does not suffer stress corrosion cracking, indicate that the structural integrity of the compartment should be maintained and failure should not propagate from GDH to GDH.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , ,