Article ID Journal Published Year Pages File Type
299455 Nuclear Engineering and Design 2006 11 Pages PDF
Abstract

The design of a 700 MWe pressurized heavy water reactor has been developed. The design is based on the twin 540 MWe reactors at Tarapur of which the first unit has been made critical in less than 5 years from construction commencement. In the 700 MWe design boiling of the coolant, to a limited extent, has been allowed near the channel exit. While making the plant layout more compact, emphasis has been on constructability. Saving in capital cost of about 15%, over the present units, is expected. The paper describes salient design features of 700 MWe pressurized heavy water reactor.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
,