Article ID Journal Published Year Pages File Type
299543 Nuclear Engineering and Design 2005 8 Pages PDF
Abstract

A forced outage due to a steam generator tube leak in a Korean nuclear power plant has been reported [Kim, J.S., Hwang, S.S., et al., 1999. KAERI Internal Report (Korean). Destructive analysis on pulled tubes from Ulchin unit 1. Korea Atomic Energy Research Institute]. Primary water stress corrosion cracking has occurred in many tubes in the plant, and they were repaired using sleeves or plugs. In order to develop proper repair criteria, it is necessary to understand the leak behavior of the tubes containing stress corrosion cracks. Cracked specimens were prepared using a room temperature cracking technique, and the leak rates and burst pressures of the degraded tubes were determined both at room temperature and at a high temperature. Some tubes with 100% through wall cracks did not show a leakage at 10.8 MPa, which is the typical pressure difference of the pressurized water reactors (PWRs) during a normal operation. In some tests, the leak rates of the tubes increased with time at a constant pressure. In a high temperature pressure test at 282 °C one specimen showed a very small leakage at 18.6 MPa, which stopped after a small increase in the test pressure. Because stress corrosion cracks can develop at relatively low stresses, even 100% through wall cracks can be so tight that they will not leak at a normal operating pressure.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , , , ,