Article ID Journal Published Year Pages File Type
301154 Renewable Energy 2012 9 Pages PDF
Abstract

The National Strategy for PV systems implementation in Romania sets as target 260 MW installed power by 2020. Here, the potential of the local administration to install a total of 200 MW in eighty localities is studied. Plants based on modules consisting of polycristalline PV cells are considered. The modules are mounted at fix tilt angle. Most of the PV plants should have about 6 MW installed power while the country’s capital (Bucharest) should have about 47 MW installed power. The total electric energy produced per year by all PV plants is about 0.45% of the country’s electric energy consumption in 2009. Building the PV plants yields a dimishment of the GHG emission by about 1.5% of the country’s CO2 emissions in 2007 and the oil saving is about 0.69% of the total yearly consumption in 2009. Governmental or European financial support is needed for successfull implementation. The Simple Payback Period may range between about 43 years (no financial support) and less than 4 years (when the equipment is obtained by using non-reimbursed financial resources).

► The target of the Romanian Strategy for PV systems implementation is 260 MW installed by 2020. ► The potential of the local administration to install 200 MW in 80 localities is studied. ► Most of the PV plants should have less than 6 MW installed power. ► The electric energy produced yearly is 0.45% of country’s consumption in 2009. ► Governmental/European financial support is needed for successfull implementation.

Related Topics
Physical Sciences and Engineering Energy Renewable Energy, Sustainability and the Environment
Authors
, ,