Article ID Journal Published Year Pages File Type
312604 Tunnelling and Underground Space Technology 2011 9 Pages PDF
Abstract

During the construction of the ventilation shaft A of the Luzhou Line of Taipei Rapid Transit System (TRTS), the shield machine obliged to disassemble in grouted soils outside the shaft as the excavations in the shaft were still in progress. This paper describes the use of ground improvement followed by cement and chemical grouting as well as dewatering to both reduce the water ingress to acceptable volumes and the piezometric pressures in an alluvial silty sand layer during the shield disassembly task. In addition, the chamber sealing and bulkhead installation were designed to prevent the tunnels and shaft from any accident through which the tunnel would subsequently pass.

Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Geotechnical Engineering and Engineering Geology