Article ID Journal Published Year Pages File Type
312667 Transportation Research Part A: Policy and Practice 2007 18 Pages PDF
Abstract

With the increasing traffic volumes in European railway networks and reports on capacity deficiencies that cause reliability problems, the need for efficient disturbance management becomes evident. This paper presents a heuristic approach for railway traffic re-scheduling during disturbances and a performance evaluation for various disturbance settings using data for a large part of the Swedish railway network that currently experiences capacity deficiencies. The significance of applying certain re-scheduling objectives and their correlation with performance measures are also investigated. The analysis shows e.g. that a minimisation of accumulated delays has a tendency to delay more trains than a minimisation of total final delay or total delay costs. An experimental study of how the choice of planning horizon in the re-scheduling process affects the network on longer-term is finally presented. The results indicate that solutions which are good on longer-term can be achieved despite the use of a limited planning horizon. A 60 min long planning horizon was sufficient for the scenarios in the experiments.

Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
,