Article ID Journal Published Year Pages File Type
313057 Tunnelling and Underground Space Technology 2014 8 Pages PDF
Abstract

•The performance prediction and cutter consumption of roadheaders for the eight different ore types were investigated.•The instantaneous cutting rates of a selected roadheader were calculated using the specific energy values.•Simple and multiple regression models were also derived for the estimation of SE from the ore properties.

Using mechanical miners such as roadheaders may be a solution to increase the production rate and to decrease the costs in metallic mines. In this study, the performance prediction and cutter consumption of roadheaders were investigated for the eight different ore types. Small-scale linear cutting tests, Cerchar abrasivity tests and physico-mechanical tests were carried out on the ore samples collected from the site. The instantaneous cutting rates of a selected roadheader were calculated using specific energy (SE) values and compared to the previous models. The amount of cutter consumption was also calculated for each ore type and it was seen that the estimated cutter consumption values for the tested ores are generally lower than the proposed economical upper limit. Since only the performance prediction and cutter consumption of roadheaders were investigated for the excavation of ores in the current study, analyzing all mining operations is necessary for the adaptation of roadheader excavation to a mine. Simple and multiple regression models were also derived for the estimation of SE from the ore properties. A significant practical model including the Schmidt hammer value and density of ores was produced from the multiple regression analysis. This regression model can be reliably used for the estimation of SE especially for the preliminary studies.

Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Geotechnical Engineering and Engineering Geology
Authors
, , ,