| Article ID | Journal | Published Year | Pages | File Type |
|---|---|---|---|---|
| 4403775 | Procedia Environmental Sciences | 2011 | 7 Pages |
Abstract
The landfill leachate treatment project has been designed with combined processes, which consists of coagulation and ammonia-nitrogen stripping, UBF anaerobic process and two stages of Anoxic/Oxic process, filter, UF and RO deep treatment. The outlet water would meet the standard shown in the table 3 in the “Standard for Pollution Control on the Landfill Site of Municipal Solid Waste” (GB16889-2008). After the project had been completely finished, the commissioning was going on. After 85 days, the results showed that the outlet water was 100m3/d, its COD was about 20 mg/L, and the ammonia-nitrogen was below 8 mg/L.
Related Topics
Life Sciences
Environmental Science
Ecology
