Article ID Journal Published Year Pages File Type
4471651 Waste Management 2014 7 Pages PDF
Abstract

•Evaluation of social benefits related to the reclamation of an old uncontrolled waste deposit.•Monetary assessment of the community-perceived benefit of Landfill Mining and the subsequent creation of a public park.•Application of the Contingent Valuation Method to a case study.

A comprehensive approach for the evaluation of the economic feasibility of landfill mining (LFM) should take into account not only the direct costs and revenues for the private investor, but also the social benefits or costs (generally called externalities), in such a way that projects generating major social benefits (and no significant private revenues) are not overlooked.With a view to contributing to the development of a common framework for the evaluation of LFM projects, this paper presents the results of a case study where the issue of the assessment of social benefits from a LFM project is addressed. In particular, the Contingent Valuation Method is applied for the monetary assessment of the community-perceived benefits from the remediation of an old uncontrolled waste deposit by means of LFM and the conversion of the area into a park.Based on the results of a survey carried out on a random sample of people living near the old landfill, the economic values of the individual willingness to pay (WTP) for LFM and the subsequent creation of a public park were calculated and the correlations with the relevant variables (distance from the landfill site, age, income, sex, education level) assessed. The results were then suitably extended and the monetary value of the welfare increase of the whole population resident in the area and potentially affected both by LFM and the creation of the park was calculated.

Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Geotechnical Engineering and Engineering Geology
Authors
, ,