Article ID Journal Published Year Pages File Type
4652773 Electronic Notes in Discrete Mathematics 2010 8 Pages PDF
Abstract

This paper considers the problem of scheduling n independent jobs on m uniform parallel machines, with the aim of minimizing the total weighted completion time. We present two hybrid meta-heuristics to solve this problem. Based on a large set of instances, an experimental study has been carried out to evaluate our methods.

Related Topics
Physical Sciences and Engineering Mathematics Discrete Mathematics and Combinatorics