In a project, timeliness in doing any job should be emphasized in addition to the quality of the workmanship be in accordance with existing standards or regulations. This is true in case of Wooden Sailing Boat Project by Maritime Challenge ITS. But it is undeniable that many things can cause this project not in accordance with a predetermined schedule. The project delay is mainly caused by insufficient design, procurement delays, production delays and bad management. Insufficient design caused by less design detail, dimensionalchanges, file deleted, no backup file, drawing revision late, design convert late, design modeling late and limited understanding of designer. And minimal cut with probability of insufficient design are dimensional changes, file deleted, no backup file, less design detail, drawing revision late – limited understanding of designer, drawing revision late – design convert late (0.0113, 0.0232, 0.0122, 0.0122, 0.0000185, 0.00000165 respectively).