Article ID Journal Published Year Pages File Type
4675146 Procedia Earth and Planetary Science 2011 6 Pages PDF
Abstract

After the large water accident with the serious collapse occurred in Luotuoshan coal mine, to achieve rescuing emergency rapidly, the scheme with blocking up water was adopted. The concerned technical measures include forming blocking up water wall‘s skeleton through injecting two-fluid slurry into tunnel, filling these gaps in skeleton with high flow under static pressure condition, reinforcing alluvium on the tunnel floor with high pressure, and filling tiny cracks in block up water wall with draining. The tunnel was blocked up successfully in only 54 days and the effect reaches 99.97%. The successful application of these technical measures provided valuable experiences that can draw lessons for engineering works under similar conditions in the future.

Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Atmospheric Science