Article ID Journal Published Year Pages File Type
4744362 Engineering Geology 2009 10 Pages PDF
Abstract
The excavation of a by-pass tunnel for the Rantenbach river in the opposite slope, as well as a toe weight at the bottom of the slope in connection with a covered tunnel for the Rantenbach River, appear not to be economical from the present point of view.
Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Geotechnical Engineering and Engineering Geology
Authors
, , , , ,