Article ID Journal Published Year Pages File Type
4764308 Chinese Journal of Chemical Engineering 2016 20 Pages PDF
Abstract
Selection of a suitable start-up scheme for compression and refrigeration system of ethylene plants is a multi-objective problem balancing the SS production, safe operating range and precooling time. In this paper, a method is developed to select start-up schemes with sufficient safe operating range and good effort of emission reduction and energy saving based on plant devices and resources. It is found that higher SS consumption increases the process energy loss, but yields shorter precooling time and safer operating range. The method to select and determine a suitable start-up scheme is validated using industrial data.123
Related Topics
Physical Sciences and Engineering Chemical Engineering Chemical Engineering (General)
Authors
, , , , ,