Article ID Journal Published Year Pages File Type
4764710 Computers & Chemical Engineering 2017 54 Pages PDF
Abstract
The RD-based process studied eliminated the need for the top ethanol fresh feed, thus eliminating the need for an ethanol recovery section. The payback period was found to be 3 years, if the RD column, condenser and reboiler are purchased and only 1.5 years if only the cost of purchasing a RD column is considered. The advantages of the RD-based process were found to be the higher yield of ETBE product, as well as lower costs of ethanol and steam.
Related Topics
Physical Sciences and Engineering Chemical Engineering Chemical Engineering (General)
Authors
, , ,